On this occasion our client needed to install a system to handle loads when they carry out maintenance tasks on production machines. As these are difficult to access areas, it was decided to install two monorails on the deck of the ship.
The first monorail measures 13.6 m and consists of two sections, while the second is 5.8 m and has a single section. Both are stapled to the trusses of the warehouse and incorporate two manual translation trolleys with a 125 kg manual chain hoist. As its use is not very frequent, a manual system was chosen in each monorail, in order to reduce the cost of the installation.
The maneuvering chain is long enough to allow the hoist to be operated from the ground.